Installation
1. Place the RISI PM-100 as close to the required blasting machine as possible.
2. Connect the OUTPUT of the blaster to the INPUT of the PM-100 using RISI twin lead cable, P/N 167-8559.
3. Connect the EBW detonator to the OUTPUT of the PM-100 using a maximum of 100 ft. of RISI twin lead cable, P/N 167-8559, or a maximum of 300 ft. of RISI coaxial cable, P/N 167-2669. |
Required Machine Output
10 Joules, minimum
350 volts, minimum
PM-100 Specification
Size: 3" X 4" X 5"
Weight: 6 pounds (approx.)
Output: Sufficient to function a RISI EBW
Detonator when properly installed.
|